N E W S
2007-03-26Systecon supports Statoil in dimensioning spares pool
Systecon has received an order from Statoil ASA, Stavanger, to optimize the spare part solution for a pool of gas turbine engines used in the oil production industry in Norway. The work is a continuation from previously performed analyses and will study the effects of an enlargement of the pool as well as other changes in the dimensioning parameters. Systecon will perform the analysis with the use of the spare part optimization tool OPUS10. 
M O R E N E W S
2012-01-17
» Rail Asset Management Event
2012-01-13
» CATLOC version 6 released
2011-12-15
» New order from FMV for LSA Consultancy Services
2011-11-08
» Systems Engineering conference
2011-11-07
» New systecon consultant
2011-10-10
» Australian Submarine Corporation purchase OPUS10

« 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 »